<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Welcome to the High Availability Hosting Blog</title>
	<atom:link href="http://www.hahosting.info/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.hahosting.info</link>
	<description>The blog for HA Hosting, TheVirtualCloud and The Sheffield Data Centre</description>
	<lastBuildDate>Fri, 18 May 2012 08:39:13 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.8.4</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>DC1.5 latest pictures</title>
		<link>http://www.hahosting.info/2012/05/dc1-5-latest-pictures/</link>
		<comments>http://www.hahosting.info/2012/05/dc1-5-latest-pictures/#comments</comments>
		<pubDate>Fri, 18 May 2012 08:39:13 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[DC1.5]]></category>
		<category><![CDATA[sheffield data centre]]></category>

		<guid isPermaLink="false">http://www.hahosting.info/?p=984</guid>
		<description><![CDATA[Now the plasterers have finished skimming the offices and computer room of the Sheffield Data Centre Extension (DC1.5), we can begin preperations for the first round of decoration, and the first/second fix of cable trays and associated stuff&#8230;
Whilst we need to wait for the plaster to fully dry before we can paint, the joiners have [...]]]></description>
			<content:encoded><![CDATA[<p>Now the plasterers have finished skimming the offices and computer room of the Sheffield Data Centre Extension (DC1.5), we can begin preperations for the first round of decoration, and the first/second fix of cable trays and associated stuff&#8230;</p>
<p>Whilst we need to wait for the plaster to fully dry before we can paint, the joiners have been able to start hanging doors, fitting window frames etc&#8230;</p>

<a href='http://www.hahosting.info/2012/05/dc1-5-latest-pictures/dc1-5_12_upstairs/' title='DC1.5_12_upstairs'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_12_upstairs-150x150.jpg" class="attachment-thumbnail" alt="Above the data centre, which will eventually be the air handling plant room and more offices" title="DC1.5_12_upstairs" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-latest-pictures/dc1-5_13_offices/' title='DC1.5_13_offices'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_13_offices-150x150.jpg" class="attachment-thumbnail" alt="Offices taking shape" title="DC1.5_13_offices" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-latest-pictures/dc1-5_14_computer_room_doors/' title='DC1.5_14_computer_room_doors'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_14_computer_room_doors-150x150.jpg" class="attachment-thumbnail" alt="Hot and Cold aisle doors" title="DC1.5_14_computer_room_doors" /></a>

<p>Long term temporary lights (it makes sense to us!) will be installed in the computer room soon, so pictures of it&#8217;s evolution will follow then!</p>
]]></content:encoded>
			<wfw:commentRss>http://www.hahosting.info/2012/05/dc1-5-latest-pictures/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>DC1.5 update</title>
		<link>http://www.hahosting.info/2012/05/dc1-5-update/</link>
		<comments>http://www.hahosting.info/2012/05/dc1-5-update/#comments</comments>
		<pubDate>Wed, 16 May 2012 17:37:54 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Announcements]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[colocation]]></category>
		<category><![CDATA[DC1.5]]></category>
		<category><![CDATA[rack space]]></category>
		<category><![CDATA[www.sheffielddatacentre.com]]></category>

		<guid isPermaLink="false">http://www.hahosting.info/?p=980</guid>
		<description><![CDATA[It&#8217;s been a busy week for the contractors building the Sheffield Data Centre Extension (or DC1.5), plasterers and joiners have been in for the past week finishing off walls and ceilings.  We&#8217;re told the plasterers will finish tomorrow allowing the joiners to complete door frames and other wood stuff later this week!
Sorry for the lack [...]]]></description>
			<content:encoded><![CDATA[<p>It&#8217;s been a busy week for the contractors building the Sheffield Data Centre Extension (or DC1.5), plasterers and joiners have been in for the past week finishing off walls and ceilings.  We&#8217;re told the plasterers will finish tomorrow allowing the joiners to complete door frames and other wood stuff later this week!</p>
<p>Sorry for the lack of pictures, it&#8217;s been a bit dark in there since the ceilings went in (there&#8217;s no lights yet), but we do have some pictures which we&#8217;ll put up soon!!  Focus will soon turn towards paint and colours, which will no doubt be an interesting meeting  ;-)</p>
<p>Interest in DC1.5 has gained momentum too, with more customers now expressing interest in rack space as it becomes available.  We&#8217;ve given several short tours around the build now, all met with favourable reviews.</p>
<p>(High Quality Colocation Rack Space in Sheffield &#8211; www.sheffielddatacentre.com)</p>
]]></content:encoded>
			<wfw:commentRss>http://www.hahosting.info/2012/05/dc1-5-update/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>BT Fibre Live</title>
		<link>http://www.hahosting.info/2012/05/bt-fibre-live/</link>
		<comments>http://www.hahosting.info/2012/05/bt-fibre-live/#comments</comments>
		<pubDate>Wed, 16 May 2012 17:28:37 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Sheffield Data Centre]]></category>
		<category><![CDATA[BGP]]></category>
		<category><![CDATA[bt fibre]]></category>
		<category><![CDATA[sheffield data centre]]></category>
		<category><![CDATA[tier 3]]></category>

		<guid isPermaLink="false">http://www.hahosting.info/?p=978</guid>
		<description><![CDATA[The BT Fibre to the Sheffield Data Centre was comissioned and made live today.  Testing has already begun routing addresses over the new connection, with a view to failover testing between both our existing Virgin Media fibre, and the new BT fibre soon.
The new fibre connection, in our under-constuction DC1.5, will provide a dedicated connection [...]]]></description>
			<content:encoded><![CDATA[<p>The BT Fibre to the Sheffield Data Centre was comissioned and made live today.  Testing has already begun routing addresses over the new connection, with a view to failover testing between both our existing Virgin Media fibre, and the new BT fibre soon.</p>
<p>The new fibre connection, in our under-constuction DC1.5, will provide a dedicated connection to our new computer room, and also provide load-sharing and redundancy for the existing connection in our existing computer room.  Both connections will be linked via dedicated transit VLAN&#8217;s between the two buildings.</p>
<p>No end-user disruption is planned during these early tests &#8211; we have a subnet not currently allocated to customers which we&#8217;re using for BGP testing.</p>
<p>On the whole a great day!  One step closer to Tier 3 perhaps&#8230;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.hahosting.info/2012/05/bt-fibre-live/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>DC1.5 Build Progress</title>
		<link>http://www.hahosting.info/2012/05/dc1-5-build-progress/</link>
		<comments>http://www.hahosting.info/2012/05/dc1-5-build-progress/#comments</comments>
		<pubDate>Wed, 09 May 2012 09:05:31 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[Sheffield Data Centre]]></category>
		<category><![CDATA[DC1.5]]></category>
		<category><![CDATA[sheffield data centre extension]]></category>

		<guid isPermaLink="false">http://www.hahosting.info/?p=969</guid>
		<description><![CDATA[The buld at the Sheffield Data Centre Extension (DC1.5) is progressing well.  All the internal studwork for the offices and computer room shell is complete, and fireboarding has started. This first phase of the build is due to be completed this weekend, after which the first fix cabling can begin, as well as the first [...]]]></description>
			<content:encoded><![CDATA[<p>The buld at the Sheffield Data Centre Extension (DC1.5) is progressing well.  All the internal studwork for the offices and computer room shell is complete, and fireboarding has started. This first phase of the build is due to be completed this weekend, after which the first fix cabling can begin, as well as the first hints of decorating!</p>
<p>A few of the latest build pics:</p>

<a href='http://www.hahosting.info/2012/05/dc1-5-build-progress/dc1-5_6_entrance_corridor/' title='DC1.5_6_Entrance_Corridor'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_6_Entrance_Corridor-150x150.jpg" class="attachment-thumbnail" alt="Entrance corridor" title="DC1.5_6_Entrance_Corridor" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-build-progress/dc1-5_7_computer_room_boarded/' title='DC1.5_7_Computer_Room_Boarded'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_7_Computer_Room_Boarded-150x150.jpg" class="attachment-thumbnail" alt="Computer Room now boarded" title="DC1.5_7_Computer_Room_Boarded" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-build-progress/dc1-5_8_kitchen_to_corridor/' title='DC1.5_8_Kitchen_To_Corridor'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_8_Kitchen_To_Corridor-150x150.jpg" class="attachment-thumbnail" alt="Kitchen entrance taking shape" title="DC1.5_8_Kitchen_To_Corridor" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-build-progress/dc1-5_9_kitchen_rear/' title='DC1.5_9_Kitchen_Rear'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_9_Kitchen_Rear-150x150.jpg" class="attachment-thumbnail" alt="A sink will go here eventually!" title="DC1.5_9_Kitchen_Rear" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-build-progress/dc1-5_10_office_ceiling/' title='DC1.5_10_Office_Ceiling'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_10_Office_Ceiling-150x150.jpg" class="attachment-thumbnail" alt="" title="DC1.5_10_Office_Ceiling" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-build-progress/dc1-5_11_corridor/' title='DC1.5_11_Corridor'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_11_Corridor-150x150.jpg" class="attachment-thumbnail" alt="" title="DC1.5_11_Corridor" /></a>

<p>We are currently looking into different uses for the computer room in DC1.5, the obvious use is more colo space, however we&#8217;ve already had enquiries for a private suite, the other main consideration is splitting our cloud services across both computer rooms.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.hahosting.info/2012/05/dc1-5-build-progress/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>DC1.5 First Pictures</title>
		<link>http://www.hahosting.info/2012/05/dc1-5-first-pictures/</link>
		<comments>http://www.hahosting.info/2012/05/dc1-5-first-pictures/#comments</comments>
		<pubDate>Thu, 03 May 2012 19:18:15 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[Sheffield Data Centre]]></category>
		<category><![CDATA[DC 1.5]]></category>
		<category><![CDATA[extension]]></category>
		<category><![CDATA[sheffield data centre]]></category>

		<guid isPermaLink="false">http://www.hahosting.info/?p=960</guid>
		<description><![CDATA[2 days into construction and the interior of the new unit is unrecognisable from the beginning of the week.
The carpenters have been on site erecting stud walls, starting to install ceiling joists and generally being dammed efficient!  Lots of deliveries have arrived on site, mainly construction materials to be installed over the next few days.
Here&#8217;s [...]]]></description>
			<content:encoded><![CDATA[<p>2 days into construction and the interior of the new unit is unrecognisable from the beginning of the week.</p>
<p>The carpenters have been on site erecting stud walls, starting to install ceiling joists and generally being dammed efficient!  Lots of deliveries have arrived on site, mainly construction materials to be installed over the next few days.</p>
<p>Here&#8217;s some pictures of the start of the Sheffield Data Centre Extension construction:</p>

<a href='http://www.hahosting.info/2012/05/dc1-5-first-pictures/dc1-5_0_empty_unit/' title='DC1.5_0_Empty_Unit'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_0_Empty_Unit-150x150.jpg" class="attachment-thumbnail" alt="The empty unit, except a temporary rack for the BT fibre" title="DC1.5_0_Empty_Unit" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-first-pictures/dc1-5_1_studwork_starts/' title='DC1.5_1_Studwork_Starts'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_1_Studwork_Starts-150x150.jpg" class="attachment-thumbnail" alt="Day 1 - Studwork starts" title="DC1.5_1_Studwork_Starts" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-first-pictures/dc1-5_2_computer_room_and_office_walls_start/' title='DC1.5_2_Computer_Room_and_Office_Walls_Start'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_2_Computer_Room_and_Office_Walls_Start-150x150.jpg" class="attachment-thumbnail" alt="" title="DC1.5_2_Computer_Room_and_Office_Walls_Start" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-first-pictures/dc1-5_3_ceiling_starts_over_offices/' title='DC1.5_3_Ceiling_Starts_Over_Offices'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_3_Ceiling_Starts_Over_Offices-150x150.jpg" class="attachment-thumbnail" alt="Day 2 - Ceiling joists above offices" title="DC1.5_3_Ceiling_Starts_Over_Offices" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-first-pictures/dc1-5_4_into_offices/' title='DC1.5_4_Into_Offices'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_4_Into_Offices-150x150.jpg" class="attachment-thumbnail" alt="Day 2 - View into management offices with computer room behind" title="DC1.5_4_Into_Offices" /></a>
<a href='http://www.hahosting.info/2012/05/dc1-5-first-pictures/dc1-5_5_computer_room_ceiling_starts/' title='DC1.5_5_Computer_Room_Ceiling_Starts'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/05/DC1.5_5_Computer_Room_Ceiling_Starts-150x150.jpg" class="attachment-thumbnail" alt="Day 2 - Ceiling above computer room starts to take shape" title="DC1.5_5_Computer_Room_Ceiling_Starts" /></a>

<p>We&#8217;ll keep posting pictures every other day or so&#8230;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.hahosting.info/2012/05/dc1-5-first-pictures/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sheffield Data Centre Extension &#8211; Construction starts today!</title>
		<link>http://www.hahosting.info/2012/05/sheffield-data-centre-extension-construction-starts-today/</link>
		<comments>http://www.hahosting.info/2012/05/sheffield-data-centre-extension-construction-starts-today/#comments</comments>
		<pubDate>Wed, 02 May 2012 15:32:47 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Announcements]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Sheffield Data Centre]]></category>
		<category><![CDATA[BGP]]></category>
		<category><![CDATA[build]]></category>
		<category><![CDATA[DC 1.5]]></category>
		<category><![CDATA[disaster recovery]]></category>
		<category><![CDATA[fibre]]></category>
		<category><![CDATA[redundant]]></category>
		<category><![CDATA[sheffield data centre]]></category>

		<guid isPermaLink="false">http://www.hahosting.info/?p=956</guid>
		<description><![CDATA[It gives us great pleasure to announce that today (02/05/2012), work has started on a second unit within the same business park as the Sheffield Data Centre. Formally known as the Sheffield Data Centre Extension (or DC 1.5) the new unit will give us new offices, conference facilities, rest areas, potential for a Disaster Recovery [...]]]></description>
			<content:encoded><![CDATA[<p><strong>It gives us great pleasure to announce that today (02/05/2012), work has started on a second unit within the same business park as the Sheffield Data Centre.</strong> Formally known as the Sheffield Data Centre Extension (or DC 1.5) the new unit will give us new offices, conference facilities, rest areas, potential for a Disaster Recovery suite, as well as space for 18 more racks.</p>
<p>We can now reveal the BT Fibre which was installed last week was installed into this new unit, along with ductwork for fibre between the new and existing units allowing BT and Virgin Media to connect to both buildings.  A fibre &#8220;loop&#8221; will be created later this month.</p>
<p>Lots of work needs to be done before this new unit is ready for racks (or our desks!), construction won&#8217;t affect the current Data Centre or our customers, and plans to make live the 10 new racks in our current unit are still progressing.  Rack space in DC 1.5 is expected to be available in Q4 of this year.</p>
<p>There is potential for a private facility of 15 racks or a private suite of either 5 or 10 managed racks.</p>
<p>RCM Interiors has been appointed to complete the building construction which should take until the end of May, after which cabling, decoration, and general fit-out will take place in June and July.</p>
<p>Specifications, construction pictures and more info for DC 1.5 will appear on the blog over the next few days.</p>
<p>Once complete, the Sheffield Data Centre complex will boast the following:</p>
<ul>
<li>2 fibre connections via 2 providers</li>
<li>Full BGP failover network</li>
<li>Mains, UPS and diesel generator power*</li>
<li>A+B UPS feeds into DC 1.5</li>
<li>Multiple redundant Evaporative Coolers*</li>
<li>Multiple redundant hot air extractors*</li>
<li>1848U of rack space</li>
<li>Welfare / rest space</li>
<li>Disaster Recovery space</li>
<li>24/7/365 access for full rack customers*</li>
</ul>
<p><em>*Available now in the current Data Centre.</em></p>
<p>If you&#8217;re interested in rack space in our facility, or want to discuss how our services can benefit your business, contact us on 0114 2280022, or email sales&lt;at&gt;hahosting.com</p>
]]></content:encoded>
			<wfw:commentRss>http://www.hahosting.info/2012/05/sheffield-data-centre-extension-construction-starts-today/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>BT Fibre Install Pics</title>
		<link>http://www.hahosting.info/2012/04/bt-fibre-install-pics/</link>
		<comments>http://www.hahosting.info/2012/04/bt-fibre-install-pics/#comments</comments>
		<pubDate>Sat, 28 Apr 2012 17:12:17 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Sheffield Data Centre]]></category>
		<category><![CDATA[fibre]]></category>
		<category><![CDATA[Install]]></category>
		<category><![CDATA[Openreach]]></category>
		<category><![CDATA[sheffield data centre]]></category>

		<guid isPermaLink="false">http://www.hahosting.info/?p=950</guid>
		<description><![CDATA[It turns out Openreach had done most of the underground work beforehand, so we have no pictures of works up to the Data Centre, however we do have some pics of the install on-site. (Pictures taken yesterday 27/04/2012)
BT are back on Monday (30th) to do some more works  (ISDN, and NTE installs we think!)
]]></description>
			<content:encoded><![CDATA[<p>It turns out Openreach had done most of the underground work beforehand, so we have no pictures of works up to the Data Centre, however we do have some pics of the install on-site. (Pictures taken yesterday 27/04/2012)</p>

<a href='http://www.hahosting.info/2012/04/bt-fibre-install-pics/bt_fibre_install-2012-04-27-1/' title='BT_Fibre_Install-2012-04-27-1'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/04/BT_Fibre_Install-2012-04-27-1-150x150.jpg" class="attachment-thumbnail" alt="&quot;manhole&quot;" title="BT_Fibre_Install-2012-04-27-1" /></a>
<a href='http://www.hahosting.info/2012/04/bt-fibre-install-pics/bt_fibre_install-2012-04-27-2/' title='BT_Fibre_Install-2012-04-27-2'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/04/BT_Fibre_Install-2012-04-27-2-150x150.jpg" class="attachment-thumbnail" alt="Openreach on site" title="BT_Fibre_Install-2012-04-27-2" /></a>
<a href='http://www.hahosting.info/2012/04/bt-fibre-install-pics/bt_fibre_install-2012-04-27-3/' title='BT_Fibre_Install-2012-04-27-3'><img width="150" height="150" src="http://www.hahosting.info/wp-content/uploads/2012/04/BT_Fibre_Install-2012-04-27-3-150x150.jpg" class="attachment-thumbnail" alt="Splicing inside" title="BT_Fibre_Install-2012-04-27-3" /></a>

<p>BT are back on Monday (30th) to do some more works  (ISDN, and NTE installs we think!)</p>
]]></content:encoded>
			<wfw:commentRss>http://www.hahosting.info/2012/04/bt-fibre-install-pics/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>BT Fibre blow-in today!!</title>
		<link>http://www.hahosting.info/2012/04/bt-fibre-blow-in-today/</link>
		<comments>http://www.hahosting.info/2012/04/bt-fibre-blow-in-today/#comments</comments>
		<pubDate>Fri, 27 Apr 2012 06:44:56 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Sheffield Data Centre]]></category>
		<category><![CDATA[fibre]]></category>
		<category><![CDATA[Openreach]]></category>
		<category><![CDATA[sheffield data centre]]></category>

		<guid isPermaLink="false">http://www.hahosting.info/?p=947</guid>
		<description><![CDATA[Openreach are on site today at the Sheffield Data Centre to blow in a second fibre.  Originally ordered back in January, this new fibre will be blown in today and connected to an empty rack for testing.
It will be a couple of weeks before the fibre is &#8220;switched on&#8221; within BGP for carrying live traffic, [...]]]></description>
			<content:encoded><![CDATA[<p>Openreach are on site today at the Sheffield Data Centre to blow in a second fibre.  Originally ordered back in January, this new fibre will be blown in today and connected to an empty rack for testing.</p>
<p>It will be a couple of weeks before the fibre is &#8220;switched on&#8221; within BGP for carrying live traffic, until then we&#8217;ll be using it for testing and some internal project work.</p>
<p>Pictures of manholes, ducting and fibre sure to follow&#8230; watch this space!  :-)</p>
]]></content:encoded>
			<wfw:commentRss>http://www.hahosting.info/2012/04/bt-fibre-blow-in-today/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>New racks in place!</title>
		<link>http://www.hahosting.info/2012/04/new-racks-in-place/</link>
		<comments>http://www.hahosting.info/2012/04/new-racks-in-place/#comments</comments>
		<pubDate>Fri, 27 Apr 2012 06:41:50 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Sheffield Data Centre]]></category>

		<guid isPermaLink="false">http://www.hahosting.info/?p=943</guid>
		<description><![CDATA[Thanks to Rob for some great work over the last few days getting the new racks in place!
All the new racks are bolted together and in their final places within the Sheffield Data Centre.  Planning has started for Hot Air Containment and extraction, due to be installed next month.  Cabling works will also start soon [...]]]></description>
			<content:encoded><![CDATA[<p>Thanks to Rob for some great work over the last few days getting the new racks in place!</p>
<div id="attachment_945" class="wp-caption aligncenter" style="width: 490px"><img class="size-full wp-image-945" title="new_racks_2012-04-27-1" src="http://www.hahosting.info/wp-content/uploads/2012/04/new_racks_2012-04-27-11.jpg" alt="New racks in place" width="480" height="360" /><p class="wp-caption-text">New racks in place</p></div>
<p>All the new racks are bolted together and in their final places within the Sheffield Data Centre.  Planning has started for Hot Air Containment and extraction, due to be installed next month.  Cabling works will also start soon getting power and network feeds from the core to the new racks.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.hahosting.info/2012/04/new-racks-in-place/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Computer room cleared for new racks</title>
		<link>http://www.hahosting.info/2012/04/computer-room-cleared-for-new-racks/</link>
		<comments>http://www.hahosting.info/2012/04/computer-room-cleared-for-new-racks/#comments</comments>
		<pubDate>Mon, 23 Apr 2012 15:50:00 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Sheffield Data Centre]]></category>
		<category><![CDATA[new racks]]></category>
		<category><![CDATA[sheffield data centre]]></category>

		<guid isPermaLink="false">http://www.hahosting.info/?p=940</guid>
		<description><![CDATA[Anyone who has visited the Sheffield Data Centre recently may have seen some &#8220;storage space&#8221; in the computer room where the next 10 racks are scheduled to go&#8230;
All the spare parts, and general clutter has now been cleared out of the computer room ready for the next 10 racks to be installed (as blogged last [...]]]></description>
			<content:encoded><![CDATA[<p>Anyone who has visited the Sheffield Data Centre recently may have seen some &#8220;storage space&#8221; in the computer room where the next 10 racks are scheduled to go&#8230;</p>
<p>All the spare parts, and general clutter has now been cleared out of the computer room ready for the next 10 racks to be installed (as blogged last week):</p>
<div id="attachment_941" class="wp-caption aligncenter" style="width: 490px"><img class="size-full wp-image-941" title="new_racks_2012-04-20-3" src="http://www.hahosting.info/wp-content/uploads/2012/04/new_racks_2012-04-20-3.jpg" alt="Space - Ready for racks!" width="480" height="359" /><p class="wp-caption-text">Space - Ready for racks!</p></div>
<p>We have some work to do under the floor, as well as plan for cabling works.  Once done the racks will be wheeled in sometime later this week!</p>
]]></content:encoded>
			<wfw:commentRss>http://www.hahosting.info/2012/04/computer-room-cleared-for-new-racks/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

